which party takes over the project and put it into use?
normally, which party will design, execute and complete the works and remedy the defects thereof?
in general, the stages of project delivery/procurement do not include
generally speaking, prequalification is a part of in international project delivery/procurement.
which of the following marks the beginning of the construction stage?
which of the following is not the stylistic characteristic prominent in the english for international construction engineering and management?
which of the following is the reason of the extensive use of nominalization in the english for international construction engineering and management?
非限定动词的形式主要包括 。
which of the following is not a case of nominalization?
which of the following statements about passive voice in english is true?
我们应以何种心态对待异域文化?
高语境文化具有的特点是 .
根据文化的冰山模型,以下哪一项属于文化的深层结构?
以下哪一项不利于国际工程管理中的跨文化沟通?
在国际工程项目管理工作中,跨文化沟通应该是 的工作?
normally, the engineer acts as in a construction contract.
normally, the contractor’s responsibilities do not include .
the employer’s general obligations do not include .
normally, which party signs the contract with a sub-contractor?
which statement about the engineer is not true?
which statement about the “contract” in international engineering project is not true?
with regards to prices and costs, the types of construction contracts do not include .
turnkey contract is also referred as .
which statement about the epc contract is true?
which of the following is not an advantage of unit price contracts?
the purpose of prequalification in international tendering is .
“中标函”is translated as in english.
which document is a part of the tender documents?
which statement about the tendering procedure is not true?
which of the following term is not correctly translated?
the three common insurances in the construction industry do not include .
the three types of bonds/guarantees that are commonly used in international construction management do not include .
the dispute resolution process recommended by fidic do not include .
the contractor may claim for .
in the 1999 fidic red book, the contractor shall give to the engineer the notice of a claim not later than _____ after he became aware (or should have become aware) of the event or circumstance giving rise to the claim.
which of the following can best demonstrate the recommended sequence of disputes events in 1999 fidic red book?
normally, the engineer acts as in a construction contract.
turnkey contract is also referred as .
normally, which party shall design, execute and complete the works, and remedy the defects arising thereof in a epc contract?
normally, the contractor’s responsibilities do not include .
which of the following is not the stylistic characteristic prominent in the english for international construction engineering and management?
which of the following statements about passive voice in english is true?
which statement about the “contract” in international engineering project is not true?
the purpose of prequalification in international tendering is .
the three common insurances in the construction industry do not include .
the dispute resolution process recommended by fidic do not include .
the three types of bonds/guarantees that are commonly used in international construction management do not include .
高语境文化具有的特点是 .
in general, the stages of project delivery/procurement does not include .
“工程量清单” is the chinese translation for .
in the 1999 fidic red book, the contractor shall give to the engineer the notice of a claim not later than _____ after he became aware (or should have become aware) of the event or circumstance giving rise to the claim.
以下哪一项不利于国际工程管理中的跨文化沟通?
what is not required in the exchanges of project correspondence?
which of the following can best demonstrate the recommended sequence of disputes events in 1999 fidic red book?
which statement about the tendering procedure is not true?
normally, the engineer acts as in a construction contract.
turnkey contract is also referred as .
normally, which party shall design, execute and complete the works, and remedy the defects arising thereof in a epc contract?
normally, the contractor’s responsibilities do not include .
which of the following is not the stylistic characteristic prominent in the english for international construction engineering and management?
which of the following statements about passive voice in english is true?
which statement about the “contract” in international engineering project is not true?
the purpose of prequalification in international tendering is .
the three common insurances in the construction industry do not include .
the dispute resolution process recommended by fidic do not include .
the three types of bonds/guarantees that are commonly used in international construction management do not include .
高语境文化具有的特点是 .
in general, the stages of project delivery/procurement does not include .
“工程量清单” is the chinese translation for .
in the 1999 fidic red book, the contractor shall give to the engineer the notice of a claim not later than _____ after he became aware (or should have become aware) of the event or circumstance giving rise to the claim.
以下哪一项不利于国际工程管理中的跨文化沟通?
what is not required in the exchanges of project correspondence?
which of the following can best demonstrate the recommended sequence of disputes events in 1999 fidic red book?
which statement about the tendering procedure is not true?